Project Details

Metal Yapi / Mace Group

Jump Factory – Stratford

75 Celebration Avenue, Stratford, London, E20 1DB

SMSTS, SSSTS, 6G Coded Welders, Gold Card Erectors, Crane Supervisor, Appointed Person, Project Manager & Project Coordinator.

Artic lorries (40f, 60f) & Hiab, Cranes (60t, 80t, 140t and 500t) Scissor lift and Telehandler 8t (17m Boom extension)

1,150t

Jump Factory project is two residential towers each with 32 floors, the main contractor, Mace Group. Brygate was instructed to receive, store, preassemble the structural steel and deliver to the E20 Stratford site in preparation for the erection phase. The Jump Factory project consists of four main columns with a jacking system to elevate the steel frame building 6 meters at one time, secondary steel then followed to accommodate additional jumps. Metal Yapi engineered and designed the Jump Factory project and at times proved to be extremely challenging, Brygate’s team of highly skilled operatives were instructed to complete the works and adhere to the tight schedule agreed. This project was a complete success, Brygate look forward to working with Mace Group and Metal Yapi in the very near future.

Out cases

Related Projects